Beijing National Stadium, officially the National Stadium, also known as the Bird's Nest , is a stadium in Beijing,
China. The stadium was designed for use throughout the 2008 Summer Olympics and Paralympics.
History
Located in the
Olympic Green, the stadium cost US$423 million. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003 after a bidding process that included 13 final submissions. The design, which originated from the study of Chinese ceramics, implemented steel beams in order to hide supports for the retractable roof; giving the stadium the appearance of a bird's nest. Leading Chinese artist Ai Weiwei was the artistic consultant on the project. The retractable roof was later removed from the design after inspiring the stadium's most recognizable aspect.Ground was broken on 24 December 2003 and the stadium officially opened on 28 June 2008. A shopping mall and a hotel are planned to be constructed to increase use of the stadium, which has had trouble attracting events, football and otherwise, after the Olympics.
Bidding
In 2001, before Beijing had been awarded the right to host the 2008 Summer Olympics, the city held a bidding process to select the best arena design. Multiple requirements including the ability for post-Olympics use, a retractable roof, and low maintenance costs, were required of each design. The entry list was narrowed to thirteen final designs. Of the final thirteen, Li Xinggang of China Architecture Design and Research Group (CADG), said after he placed the model of the "nest" proposal at the exhibition hall and saw the rival entries he thought to himself, "We will win this." The model was approved as the top design by a professional panel; however, it was later exhibited for the public. Once again, it was selected as the top design.The "nest scheme" design became official in April 2003.
Features And Events
The eastern and western stands of Beijing National Stadium are higher than northern and southern stands, in order to improve sightlines. A 24-hour per day rainwater collector is located near the stadium; after water is purified, it is used throughout and around the stadium. Pipes placed under the playing surface gather heat in the winter to warm the stadium and coldness in the summer to cool the stadium. The stadium's design originally called for a capacity of 100,000 people; however 9,000 were removed during a simplification of the design. The new total of 91,000 would be shaved further when 11,000 temporary seats were removed after the 2008 Olympics; bringing the stadium's capacity to 80,000. The farthest seat is 460 feet (140 meters) from center field. Temperature and airflow of every surface were optimized to increase ventilation.
Beijing National Stadium hosted the Opening and Closing Ceremonies, athletic events, and football final of the 2008 Summer Olympics from 8 August to 24 August 2008.The stadium also hosted the Opening and Closing ceremonies and athletic events of the 2008 Summer Paralympics from 6 September to 17 September 2008.Though designed for track & field events of the Olympics, the stadium will continue to host sporting events, such as football, afterwards. A shopping mall and a hotel, with rooms overlooking the field, are planned to help increase use after the Olympics. Li stated, "This will become the most important public space in Beijing."